• We have been supporting investment processes for 11 years.
    We have been supporting investment processes for 11 years.
  • Drone-assisted inspections of wind turbines.
    Drone-assisted inspections of wind turbines.
  • Comprehensive solutions for transmission and distribution grids.
Environment. Formal and legal issues. Communication.
    Comprehensive solutions for transmission and distribution grids. Environment. Formal and legal issues. Communication.
  • We have worked on 90 wind farm projects, both onshore and offshore with a total capacity of 3436,4 MW.
    We have worked on 90 wind farm projects, both onshore and offshore with a total capacity of 3436,4 MW.
  • We have obtained more than 40 environmental decisions for energy projects. All Clients were satisfied.
    We have obtained more than 40 environmental decisions for energy projects. All Clients were satisfied.

Ambiens Sp. z o.o. is a leading environmental consulting company in Poland.
Our services are mainly targeted at renewable energy sector and electric power industry.

  • News

    • 24-03-2020
      EIA - large scale photovoltaic power plant

      We are just starting to support the environmental impact assessment of another large-scale photovoltaic farm (300 ha). Ambiens' portfolio in the solar energy sector exceeds 1200 ha and includes both strategic consulting, permitting and due diligence.

    • 11-03-2020
      Due diligence of photovoltaic projects

      We have completed environmental and permitting due diligence of a photovoltaic farms package for a confidential client. Some of the projects were fully permitted, part under development. The work was carried out in cooperation with a partner law firm.

    • see more
  • Map containing locations of the projects serviced by Ambiens Sp. z o.o.

      • Wind farm 59
      • Capcity: 20 MW
      • Number of turbines: 10
      • Our area of responsibility:
      • Noise Assessment
      • Wind farm 72
      • Capcity: 22 MW
      • Number of turbines: 11
      • Our area of responsibility:
      • Noise Measurements
      • Wind farm 84
      • Capcity: 48 MW
      • Number of turbines: 20
      • Our area of responsibility:
      • Noise Analysis
      • Wind farm 75
      • Capcity: 6,9 MW
      • Number of turbines: 3
      • Our area of responsibility:
      • Post - Performance Ornithological Monitoring
      • Post - Performance Chiropterological Monitoring
      • Wind farm 57
      • Capcity: 42 MW
      • Number of turbines: 12
      • Our area of responsibility:
      • Due Diligence
      • Capacity: <15MW
      • Our area of responsibility:
      • Project Specification Sheet + environmental surveys
      • Photovoltaic plant 5, 6
      • Our area of responsibility:
      • Project Specification Sheet
      • Wind farm 47
      • Capcity: 16MW
      • Number of turbines: 8
      • Our area of responsibility:
      • Chiropterological Survey
      • Ornithological Survey
      • Wind farm 71
      • Capcity: 91 MW
      • Number of turbines: 26
      • Our area of responsibility:
      • Due Diligence
      • Wind farm 58
      • Capcity: 49,5 MW
      • Number of turbines: 11
      • Our area of responsibility:
      • Due Diligence
      • Photovoltaic plant 4
      • Capacity: 2MW
      • Our area of responsibility:
      • Project Specification Sheet + Ornithological Monitoring and Vegetation Inventory
      • Photovoltaic plant 3
      • Capacity: 2MW
      • Our area of responsibility:
      • Project Specification Sheet
      • Wind farm 61
      • Capcity: 4 MW
      • Number of turbines: 2
      • Our area of responsibility:
      • Chiropterological Screening
      • Ornithological Screening
      • Project Specification Sheet
      • Ornithological Survey
      • Chiropterological Survey
      • Report EIA
      • Photovoltaic plant 7
      • Capacity: 1 MW
      • Our area of responsibility:
      • Due Diligence of the Project Specification Sheet
      • Wind farm 69
      • Capcity: 4x2 MW
      • Number of turbines: 4
      • Our area of responsibility:
      • Noise Measurements
      • Post - Performance Ornithological Monitoring
      • Post - Performance Chiropterological Monitoring
      • Wind farm 46
      • Capcity: 4MW
      • Number of turbines: 2
      • Our area of responsibility:
      • Chiropterological Survey
      • Ornithological Survey
      • Report EIA
      • Wind farm 83
      • Capcity: 8 MW
      • Number of turbines: 4
      • Our area of responsibility:
      • Noise Measurements
      • Post - Performance Ornithological Monitoring
      • Post - Performance Chiropterological Monitoring
      • Wind farm 74
      • Capcity: 106 MW
      • Number of turbines: 53
      • Our area of responsibility:
      • Environmental Supervision
      • Noise Measurements
      • Wind farm 63
      • Capcity: 48MW
      • Number of turbines: 16
      • Our area of responsibility:
      • Noise Assessment
      • Wind farm 48
      • Capcity: 4 x 2MW
      • Number of turbines: 4
      • Our area of responsibility:
      • Chiropterological Screening
      • Ornithological Screening
      • Project Specification Sheet
      • Capacity: <30MW
      • Our area of responsibility:
      • Project Specification Sheet + environmental surveys
      • Wind farm 2
      • Capcity: 1MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Report EIA
      • Wind farm 84
      • Capcity: 24 MW
      • Number of turbines: 12
      • Our area of responsibility:
      • Post - Performance Ornithological Monitoring
      • Post - Performance Chiropterological Monitoring
      • Wind farm 42, 43
      • Capcity: 2x3MW
      • Number of turbines: 2
      • Our area of responsibility:
      • Report EIA
      • Audit of the Planned Wind Farm
      • Wind farm 40, 41
      • Capcity: 2x3MW
      • Number of turbines: 2
      • Our area of responsibility:
      • Report EIA
      • Audit of the Planned Wind Farm
      • Power transmission line 3
      • Length: 36km
      • Voltage: 110kV
      • Our area of responsibility:
      • Environmental Inventory
      • Project Specfication Sheet
      • EIA Report
      • Wind farm 85
      • Capcity: 12 MW
      • Number of turbines: 6
      • Our area of responsibility:
      • Post - Performance Ornithological Monitoring
      • Post - Performance Chiropterological Monitoring
      • Power transmission line 4
      • Length: 10km
      • Voltage: 110kV
      • Our area of responsibility:
      • Environmental Inventory
      • Project Specfication Sheet
      • Wind farm 54
      • Capacity: ca. 36 MW
      • Number of turbines: 12
      • Our area of responsibility:
      • Chiropterological Screening
      • Ornithological Screening
      • Project Specification Sheet
      • Pre-investment Ornithological Monitoirng
      • Pre-investment Chiropterological Monitoring
      • Report EIA
      • Wind farm 22
      • Capcity: 3MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Report EIA
      • Wind farm 79
      • Capcity: 2 MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Noise Measurements
      • Wind farm 65
      • Capcity: 72 MW
      • Number of turbines: 24
      • Our area of responsibility:
      • Noise Assessment
      • Wind farm 80
      • Capcity: 2 MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Noise Measurements
      • Wind farm 86
      • Capcity: 6,6 MW
      • Number of turbines: 2
      • Our area of responsibility:
      • Project Specification Sheet
      • Wind farm 81
      • Capcity: 2 MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Noise Measurements
      • Wind farm 77
      • Capcity: 2 MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Bats' and Birds' Mortality Monitoring
      • Wind farm 78
      • Capcity: 6 MW
      • Number of turbines: 3
      • Our area of responsibility:
      • Bats' and Birds' Mortality Monitoring
      • Wind farm 53
      • Capcity: 17,5 MW
      • Number of turbines: 5
      • Our area of responsibility:
      • Due Diligence
      • Ornithological Screening
      • Chiropterological Screening
      • Noise Assessment
      • Wind farm 76
      • Capcity: 6 MW
      • Number of turbines: 3
      • Our area of responsibility:
      • Post - Performance Ornithological Monitoring
      • Post - Performance Chiropterological Monitoring
      • Wind farm 11
      • Capcity: 0.8MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Ornithological Screening
      • Chiropterological Screening
      • Ornithological Survey
      • Chiropterological Survey
      • Report EIA
      • Wind farm 55
      • Capcity: 0.8MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Ornithological Screening
      • Chiropterological Screening
      • Wind farm 60
      • Capcity: 0.8MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Ornithological Screening
      • Chiropterological Screening
      • Project Specification Sheet
      • Wind farm 27
      • Capcity: 0.8MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Chiropterological Screening
      • Ornithological Screening
      • Project Specification Sheet
      • Ornithological Survey
      • Report EIA
      • Wind farm 67
      • Our area of responsibility:
      • Ornithological Screening
      • Chiropterological Screening
      • Photovoltaic plant 1,2
      • Capacity: 1MW and 2MW
      • Our area of responsibility:
      • Project Specification Sheet
      • Wind farm 28
      • Capcity: 3MW
      • Number of turbines: 4
      • Our area of responsibility:
      • Chiropterological Screening
      • Ornithological Screening
      • Chiropterological Survey
      • Ornithological Survey
      • Report EIA
      • Wind farm 25
      • Capcity: 0.8MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Ornithological Screening
      • Chiropterological Screening
      • Project Specification Sheet
      • Ornithological Survey
      • Chiropterological Survey
      • Report EIA
      • Wind farm 33
      • Capcity: 18MW
      • Number of turbines: 6
      • Our area of responsibility:
      • Report EIA
      • Wind farm 5
      • Capcity: 2MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Project Specification Sheet
      • Power transmission line 2
      • Length: 36km
      • Voltage: 110kV
      • Our area of responsibility:
      • Environmental Inventory
      • Project Specfication Sheet
      • Wind farm 56
      • Capcity: 72 MW
      • Number of turbines: 24
      • Our area of responsibility:
      • Due Diligence
      • Wind farm 62
      • Capcity: 1 MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Ornithological Screening
      • Chiropterological Screening
      • Project Specification Sheet
      • Wind farm 35
      • Capcity: 3MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Project Specification Sheet
      • Wind farm 7
      • Capcity: 2MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Project Specification Sheet
      • Wind farm 66
      • Capcity: 58 MW
      • Number of turbines: 23
      • Our area of responsibility:
      • Noise Assessment
      • Wind farm 36, 37
      • Capcity: 46MW
      • Number of turbines: 20
      • Our area of responsibility:
      • Chiropterological Screening
      • Ornithological Screening
      • Noise Measurements
      • Monitoring of birds\' and baths\' mortality
      • Wind farm 17
      • Capcity: 3MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Report EIA
      • Social Considerations
      • Wind farm 64
      • Capcity: 2 MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Ornithological Survey
      • Chiropterological Survey
      • Report EIA
      • Wind farm 50
      • Capcity: 8MW
      • Number of turbines: 4
      • Our area of responsibility:
      • Post-performance Ornithological Monitoring
      • Post-performance Chiropterological Monitoring
      • Wind farm 13
      • Capcity: 3MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Report EIA
      • Wind farm 39
      • Capcity: 6MW
      • Number of turbines: 3
      • Our area of responsibility:
      • Ornithological Survey
      • Chiropterological Survey
      • Report EIA
      • Base transceiver stations 7
      • Operator: Polkomtel S.A.
      • Other operators: PTK Centertel Sp. z o.o.
      • Our area of responsibility:
      • Qualifications of Base Transceiver Stations
      • Environmental Assessments
      • Wind farm 120
      • Capcity: 4MW
      • Number of turbines: 2
      • Our area of responsibility:
      • Report EIA
      • Wind farm 51
      • Capcity: 31,5 MW
      • Number of turbines: 7
      • Our area of responsibility:
      • Chiropterological Screening
      • Ornithological Screening
      • Project Specification Sheet
      • Chiropterological Survey
      • Ornithological Survey
      • Report EIA
      • Wind farm 30
      • Capcity: 46MW
      • Number of turbines: 20
      • Our area of responsibility:
      • Chiropterological Screening
      • Ornithological Screening
      • Project Specification Sheet
      • Ornithological Survey
      • Chiropterological Survey
      • Report EIA
      • Wind farm 85
      • Capcity: 4,5 MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Project Specification Sheet
      • Wind farm 82
      • Capcity: 24 MW
      • Number of turbines: 12
      • Our area of responsibility:
      • Noise Measurements
      • Wind farm 52
      • Capacity: ca. 54 MW
      • Number of turbines: 18
      • Our area of responsibility:
      • Chiropterological Screening
      • Ornitological Screening
      • Project Specification Sheet
      • Chiropterological Survey
      • Ornithological Survey
      • Report EIA
      • Ornithological Screening
      • Power transmission line 1
      • Length: 10km
      • Voltage: 110kV
      • Our area of responsibility:
      • Chiropterological Screening
      • Ornithological Screening
      • Base transceiver stations 9
      • Operator: PTC ERA Sp. z o.o.
      • Other operators: none
      • Our area of responsibility:
      • Qualifications of Base Transceiver Stations
      • Report EIA
      • Wind farm 18
      • Capcity: 6MW
      • Number of turbines: 3
      • Our area of responsibility:
      • Report EIA
      • Wind farm 32
      • Capcity: 54MW
      • Number of turbines: 12
      • Our area of responsibility:
      • Chiropterological Screening
      • Ornithological Screening
      • Project Specification Sheet
      • Ornithological Survey
      • Chiropterological Survey
      • Report EIA
      • Wind farm 34
      • Capcity: 3MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Report EIA
      • Wind farm 45
      • Capcity: 120MW
      • Number of turbines: ca. 40
      • Our area of responsibility:
      • Project Specification Sheet
      • Chiropterological Screening
      • Ornithological Screening
      • Chiropterological Survey
      • Ornithological Survey
      • Report EIA
      • Wind farm 29
      • Capcity: 2MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Project Specification Sheet
      • Report EIA
      • Wind farm 4
      • Capcity: 2MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Report EIA
      • Wind farm 19
      • Capcity: 4MW
      • Number of turbines: 2
      • Our area of responsibility:
      • Report EIA
      • Base transceiver stations 1
      • Operator: PTC ERA Sp. z o.o.
      • Other operators: none
      • Our area of responsibility:
      • Qualifications of Base Transceiver Stations
      • Report EIA
      • Base transceiver stations 10
      • Operator: PTC ERA Sp. z o.o.
      • Other operators: none
      • Our area of responsibility:
      • Qualifications of Base Transceiver Stations
      • Report EIA
      • Wind farm 31
      • Capcity: 40MW
      • Number of turbines: 20
      • Our area of responsibility:
      • Chiropterological Screening
      • Ornithological Screening
      • Project Specification Sheet
      • Chiropterological Survey
      • Ornithological Survey
      • Report EIA
      • Wind farm 9
      • Capcity: 2MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Chiropterological Screening
      • Ornithological Screening
      • Wind farm 8
      • Capcity: 0.9MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Chiropterological Screening
      • Ornithological Screening
      • Wind farm 23
      • Capcity: 3MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Report EIA
      • Wind farm 38
      • Capcity: 14MW
      • Number of turbines: 7
      • Our area of responsibility:
      • Chiropterological Screening
      • Ornithological Screening
      • Chiropterological Survey
      • Ornithological Survey
      • Report EIA
      • Wind farm 15
      • Capcity: 2MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Project Specification Sheet
      • Wind farm 16
      • Capcity: 3MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Project Specification Sheet
      • Report EIA
      • Base transceiver stations 5
      • Operator: PTC ERA Sp. z o.o.
      • Other operators: none
      • Our area of responsibility:
      • Qualifications of Base Transceiver Stations
      • Report EIA
      • Base transceiver stations 2
      • Operator: PTC ERA Sp. z o.o.
      • Other operators: none
      • Our area of responsibility:
      • Qualifications of Base Transceiver Stations
      • Report EIA
      • Base transceiver stations 3
      • Operator: PTC ERA Sp. z o.o.
      • Other operators: none
      • Our area of responsibility:
      • Qualifications of Base Transceiver Stations
      • Report EIA
      • Base transceiver stations 11
      • Operator: PTC ERA Sp. z o.o.
      • Other operators: P4 Sp. z o.o.
      • Our area of responsibility:
      • Qualifications of Base Transceiver Stations
      • Report EIA
      • Base transceiver stations 4
      • Operator: PTC ERA Sp. z o.o.
      • Other operators: P4 Sp. z o.o.
      • Our area of responsibility:
      • Qualifications of Base Transceiver Stations
      • Report EIA
      • Wind farm 44
      • Capcity: 45MW
      • Number of turbines: 18
      • Our area of responsibility:
      • Project Specification Sheet
      • Chiropterological Screening
      • Ornithological Screening
      • Chiropterological Survey
      • Ornithological Survey
      • Report EIA
      • Wind farm 24
      • Capcity: 3MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Report EIA
      • Base transceiver stations 6
      • Operator: PTC ERA Sp. z o.o.
      • Other operators: PTK Centertel Sp. z o.o.
      • Our area of responsibility:
      • Qualifications of Base Transceiver Stations
      • Report EIA
      • Base transceiver stations 18
      • Operator: IT POLPAGER S.A.
      • Other operators: P4 Sp. z o.o., POLKOMTEL S.A.
      • Our area of responsibility:
      • Qualifications of Base Transceiver Stations
      • Environmental Assessments
      • Base transceiver stations 8
      • Operator: PTC ERA Sp. z o.o.
      • Other operators: none
      • Our area of responsibility:
      • Qualifications of Base Transceiver Stations
      • Report EIA
      • Wind farm 1
      • Capcity: 1MW
      • Number of turbines: 2
      • Our area of responsibility:
      • Report EIA
      • Wind farm 14
      • Capcity: 0.5MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Noise Assessment
      • Wind farm 73
      • Capcity: 30 MW
      • Number of turbines: 15
      • Our area of responsibility:
      • Noise Measurements
      • Post-performance Ornithological Monitoring
      • Mortality Monitoring of bats and birds
      • Wind farm 26
      • Capcity: 2.5MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Chiropterological Screening
      • Wind farm 21
      • Capcity: 4MW
      • Number of turbines: 2
      • Our area of responsibility:
      • Report EIA
      • Wind farm 3
      • Capcity: 0.9MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Ornithological Screening
      • Wind farm 12
      • Capcity: 54MW
      • Number of turbines: 18
      • Our area of responsibility:
      • Chiropterological Screening
      • Chiropterological Survey
      • Wind farm 10
      • Capcity: 0.5MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Chiropterological Screening
      • Ornithological Screening
      • Project Specification Sheet
      • Ornithological Survey
      • Chiropterological Survey
      • Base transceiver stations 13
      • Operator: AERO2 Sp. z o.o.
      • Other operators: none
      • Our area of responsibility:
      • Qualifications of Base Transceiver Stations
      • Environmental Assessments
      • Base transceiver stations 12
      • Operator: PTC ERA Sp. z o.o.
      • Other operators: P4 Sp. z o.o., POLKOMTEL S.A.
      • Our area of responsibility:
      • Qualifications of Base Transceiver Stations
      • Report EIA
      • Base transceiver stations 15
      • Operator: IT POLPAGER S.A.
      • Other operators: PTC Sp. z o.o.
      • Our area of responsibility:
      • Qualifications of Base Transceiver Stations
      • Environmental Assessments
      • Base transceiver stations 17
      • Operator: IT POLPAGER S.A.
      • Other operators: Nordisk Sp. z o.o., P4 Sp. z o.o., POLKOMTEL S.A.
      • Our area of responsibility:
      • Qualifications of Base Transceiver Stations
      • Environmental Assessments
      • Base transceiver stations 16
      • Operator: IT POLPAGER S.A.
      • Other operators: PTC Sp. z o.o., P4 Sp. z o.o., PTK Centertel Sp. z o.o., POLKOMTEL S.A.
      • Our area of responsibility:
      • Qualifications of Base Transceiver Stations
      • Environmental Assessments
      • Wind farm 6
      • Capcity: 1.6MW
      • Number of turbines: 2
      • Our area of responsibility:
      • Chiropterological Screening
      • Base transceiver stations 14
      • Operator: AERO2 Sp. z o.o.
      • Other operators: none
      • Our area of responsibility:
      • Qualifications of Base Transceiver Stations
      • Environmental Assessments
    • Hover your mouse over selected dot to see details