• We have been supporting investment processes for 8 years.
    We have been supporting investment processes for 8 years.
  • We support energy sector from the production to transmission and distribution.
    We support energy sector from the production to transmission and distribution.
  • Drone-assisted inspections of wind turbines.
    Drone-assisted inspections of wind turbines.
  • We extend our offer to the biogas sector.
    We extend our offer to the biogas sector.
  • We have worked with more than 70 wind farm projects with a total capacity almost 1400 MW.
    We have worked with more than 70 wind farm projects with a total capacity almost 1400 MW.
  • We have obtained close to 30 environmental approvals for energy projects. All Clients were satisfied.
    We have obtained close to 30 environmental approvals for energy projects. All Clients were satisfied.

Ambiens Sp. z o.o. is one of the leading environmental consulting firms in Poland.
Our services are mainly targeted at wind energy and photovoltaic as well as telecommunication industry.

  • News

  • Map containing locations of the projects serviced by Ambiens Sp. z o.o.

      • Wind farm 59
      • Capcity: 20 MW
      • Number of turbines: 10
      • Our area of responsibility:
      • Noise Assessment
      • Wind farm 72
      • Capcity: 22 MW
      • Number of turbines: 11
      • Our area of responsibility:
      • Noise Measurements
      • Wind farm 75
      • Capcity: 6,9 MW
      • Number of turbines: 3
      • Our area of responsibility:
      • Post - Performance Ornithological Monitoring
      • Post - Performance Chiropterological Monitoring
      • Wind farm 57
      • Capcity: 42 MW
      • Number of turbines: 12
      • Our area of responsibility:
      • Due Diligence
      • Photovoltaic plant 5, 6
      • Our area of responsibility:
      • Project Specification Sheet
      • Wind farm 47
      • Capcity: 16MW
      • Number of turbines: 8
      • Our area of responsibility:
      • Chiropterological Survey
      • Ornithological Survey
      • Wind farm 71
      • Capcity: 91 MW
      • Number of turbines: 26
      • Our area of responsibility:
      • Due Diligence
      • Wind farm 58
      • Capcity: 49,5 MW
      • Number of turbines: 11
      • Our area of responsibility:
      • Due Diligence
      • Photovoltaic plant 4
      • Capacity: 2MW
      • Our area of responsibility:
      • Project Specification Sheet + Ornithological Monitoring and Vegetation Inventory
      • Photovoltaic plant 3
      • Capacity: 2MW
      • Our area of responsibility:
      • Project Specification Sheet
      • Wind farm 61
      • Capcity: 4 MW
      • Number of turbines: 2
      • Our area of responsibility:
      • Chiropterological Screening
      • Ornithological Screening
      • Project Specification Sheet
      • Ornithological Survey
      • Chiropterological Survey
      • Report EIA
      • Photovoltaic plant 7
      • Capacity: 1 MW
      • Our area of responsibility:
      • Due Diligence of the Project Specification Sheet
      • Wind farm 69
      • Capcity: 4x2 MW
      • Number of turbines: 4
      • Our area of responsibility:
      • Noise Measurements
      • Post - Performance Ornithological Monitoring
      • Post - Performance Chiropterological Monitoring
      • Wind farm 46
      • Capcity: 4MW
      • Number of turbines: 2
      • Our area of responsibility:
      • Chiropterological Survey
      • Ornithological Survey
      • Report EIA
      • Wind farm 83
      • Capcity: 8 MW
      • Number of turbines: 4
      • Our area of responsibility:
      • Noise Measurements
      • Post - Performance Ornithological Monitoring
      • Post - Performance Chiropterological Monitoring
      • Wind farm 74
      • Capcity: 106 MW
      • Number of turbines: 53
      • Our area of responsibility:
      • Environmental Supervision
      • Noise Measurements
      • Wind farm 63
      • Capcity: 48MW
      • Number of turbines: 16
      • Our area of responsibility:
      • Noise Assessment
      • Wind farm 48
      • Capcity: 4 x 2MW
      • Number of turbines: 4
      • Our area of responsibility:
      • Chiropterological Screening
      • Ornithological Screening
      • Project Specification Sheet
      • Wind farm 2
      • Capcity: 1MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Report EIA
      • Wind farm 84
      • Capcity: 24 MW
      • Number of turbines: 12
      • Our area of responsibility:
      • Post - Performance Ornithological Monitoring
      • Post - Performance Chiropterological Monitoring
      • Wind farm 42, 43
      • Capcity: 2x3MW
      • Number of turbines: 2
      • Our area of responsibility:
      • Report EIA
      • Audit of the Planned Wind Farm
      • Wind farm 40, 41
      • Capcity: 2x3MW
      • Number of turbines: 2
      • Our area of responsibility:
      • Report EIA
      • Audit of the Planned Wind Farm
      • Wind farm 54
      • Capacity: ca. 36 MW
      • Number of turbines: 12
      • Our area of responsibility:
      • Chiropterological Screening
      • Ornithological Screening
      • Project Specification Sheet
      • Pre-investment Ornithological Monitoirng
      • Pre-investment Chiropterological Monitoring
      • Report EIA
      • Wind farm 22
      • Capcity: 3MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Report EIA
      • Wind farm 79
      • Capcity: 2 MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Noise Measurements
      • Wind farm 65
      • Capcity: 72 MW
      • Number of turbines: 24
      • Our area of responsibility:
      • Noise Assessment
      • Wind farm 80
      • Capcity: 2 MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Noise Measurements
      • Wind farm 86
      • Capcity: 6,6 MW
      • Number of turbines: 2
      • Our area of responsibility:
      • Project Specification Sheet
      • Wind farm 81
      • Capcity: 2 MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Noise Measurements
      • Wind farm 77
      • Capcity: 2 MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Bats' and Birds' Mortality Monitoring
      • Wind farm 78
      • Capcity: 6 MW
      • Number of turbines: 3
      • Our area of responsibility:
      • Bats' and Birds' Mortality Monitoring
      • Wind farm 53
      • Capcity: 17,5 MW
      • Number of turbines: 5
      • Our area of responsibility:
      • Due Diligence
      • Ornithological Screening
      • Chiropterological Screening
      • Noise Assessment
      • Wind farm 76
      • Capcity: 6 MW
      • Number of turbines: 3
      • Our area of responsibility:
      • Post - Performance Ornithological Monitoring
      • Post - Performance Chiropterological Monitoring
      • Wind farm 11
      • Capcity: 0.8MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Ornithological Screening
      • Chiropterological Screening
      • Ornithological Survey
      • Chiropterological Survey
      • Report EIA
      • Wind farm 55
      • Capcity: 0.8MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Ornithological Screening
      • Chiropterological Screening
      • Wind farm 60
      • Capcity: 0.8MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Ornithological Screening
      • Chiropterological Screening
      • Project Specification Sheet
      • Wind farm 27
      • Capcity: 0.8MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Chiropterological Screening
      • Ornithological Screening
      • Project Specification Sheet
      • Ornithological Survey
      • Report EIA
      • Wind farm 67
      • Our area of responsibility:
      • Ornithological Screening
      • Chiropterological Screening
      • Photovoltaic plant 1,2
      • Capacity: 1MW and 2MW
      • Our area of responsibility:
      • Project Specification Sheet
      • Wind farm 28
      • Capcity: 3MW
      • Number of turbines: 4
      • Our area of responsibility:
      • Chiropterological Screening
      • Ornithological Screening
      • Chiropterological Survey
      • Ornithological Survey
      • Report EIA
      • Wind farm 25
      • Capcity: 0.8MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Ornithological Screening
      • Chiropterological Screening
      • Project Specification Sheet
      • Ornithological Survey
      • Chiropterological Survey
      • Report EIA
      • Wind farm 33
      • Capcity: 18MW
      • Number of turbines: 6
      • Our area of responsibility:
      • Report EIA
      • Wind farm 5
      • Capcity: 2MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Project Specification Sheet
      • Power transmission line 2
      • Length: 36km
      • Voltage: 110kV
      • Our area of responsibility:
      • Environmental Inventory
      • Project Specfication Sheet
      • Wind farm 56
      • Capcity: 72 MW
      • Number of turbines: 24
      • Our area of responsibility:
      • Due Diligence
      • Wind farm 62
      • Capcity: 1 MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Ornithological Screening
      • Chiropterological Screening
      • Project Specification Sheet
      • Wind farm 35
      • Capcity: 3MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Project Specification Sheet
      • Wind farm 7
      • Capcity: 2MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Project Specification Sheet
      • Wind farm 66
      • Capcity: 58 MW
      • Number of turbines: 23
      • Our area of responsibility:
      • Noise Assessment
      • Wind farm 36, 37
      • Capcity: 46MW
      • Number of turbines: 20
      • Our area of responsibility:
      • Chiropterological Screening
      • Ornithological Screening
      • Noise Measurements
      • Monitoring of birds\' and baths\' mortality
      • Wind farm 17
      • Capcity: 3MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Report EIA
      • Social Considerations
      • Wind farm 64
      • Capcity: 2 MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Ornithological Survey
      • Chiropterological Survey
      • Report EIA
      • Wind farm 50
      • Capcity: 8MW
      • Number of turbines: 4
      • Our area of responsibility:
      • Post-performance Ornithological Monitoring
      • Post-performance Chiropterological Monitoring
      • Wind farm 13
      • Capcity: 3MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Report EIA
      • Wind farm 39
      • Capcity: 6MW
      • Number of turbines: 3
      • Our area of responsibility:
      • Ornithological Survey
      • Chiropterological Survey
      • Report EIA
      • Base transceiver stations 7
      • Operator: Polkomtel S.A.
      • Other operators: PTK Centertel Sp. z o.o.
      • Our area of responsibility:
      • Qualifications of Base Transceiver Stations
      • Environmental Assessments
      • Wind farm 120
      • Capcity: 4MW
      • Number of turbines: 2
      • Our area of responsibility:
      • Report EIA
      • Wind farm 51
      • Capcity: 31,5 MW
      • Number of turbines: 7
      • Our area of responsibility:
      • Chiropterological Screening
      • Ornithological Screening
      • Project Specification Sheet
      • Chiropterological Survey
      • Ornithological Survey
      • Report EIA
      • Wind farm 30
      • Capcity: 46MW
      • Number of turbines: 20
      • Our area of responsibility:
      • Chiropterological Screening
      • Ornithological Screening
      • Project Specification Sheet
      • Ornithological Survey
      • Chiropterological Survey
      • Report EIA
      • Wind farm 85
      • Capcity: 4,5 MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Project Specification Sheet
      • Wind farm 82
      • Capcity: 24 MW
      • Number of turbines: 12
      • Our area of responsibility:
      • Noise Measurements
      • Wind farm 52
      • Capacity: ca. 54 MW
      • Number of turbines: 18
      • Our area of responsibility:
      • Chiropterological Screening
      • Ornitological Screening
      • Project Specification Sheet
      • Chiropterological Survey
      • Ornithological Survey
      • Report EIA
      • Ornithological Screening
      • Power transmission line 1
      • Length: 10km
      • Voltage: 110kV
      • Our area of responsibility:
      • Chiropterological Screening
      • Ornithological Screening
      • Base transceiver stations 9
      • Operator: PTC ERA Sp. z o.o.
      • Other operators: none
      • Our area of responsibility:
      • Qualifications of Base Transceiver Stations
      • Report EIA
      • Wind farm 18
      • Capcity: 6MW
      • Number of turbines: 3
      • Our area of responsibility:
      • Report EIA
      • Wind farm 32
      • Capcity: 54MW
      • Number of turbines: 12
      • Our area of responsibility:
      • Chiropterological Screening
      • Ornithological Screening
      • Project Specification Sheet
      • Ornithological Survey
      • Chiropterological Survey
      • Report EIA
      • Wind farm 34
      • Capcity: 3MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Report EIA
      • Wind farm 45
      • Capcity: 120MW
      • Number of turbines: ca. 40
      • Our area of responsibility:
      • Project Specification Sheet
      • Chiropterological Screening
      • Ornithological Screening
      • Chiropterological Survey
      • Ornithological Survey
      • Report EIA
      • Wind farm 29
      • Capcity: 2MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Project Specification Sheet
      • Report EIA
      • Wind farm 4
      • Capcity: 2MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Report EIA
      • Wind farm 19
      • Capcity: 4MW
      • Number of turbines: 2
      • Our area of responsibility:
      • Report EIA
      • Base transceiver stations 1
      • Operator: PTC ERA Sp. z o.o.
      • Other operators: none
      • Our area of responsibility:
      • Qualifications of Base Transceiver Stations
      • Report EIA
      • Base transceiver stations 10
      • Operator: PTC ERA Sp. z o.o.
      • Other operators: none
      • Our area of responsibility:
      • Qualifications of Base Transceiver Stations
      • Report EIA
      • Wind farm 31
      • Capcity: 40MW
      • Number of turbines: 20
      • Our area of responsibility:
      • Chiropterological Screening
      • Ornithological Screening
      • Project Specification Sheet
      • Chiropterological Survey
      • Ornithological Survey
      • Report EIA
      • Wind farm 9
      • Capcity: 2MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Chiropterological Screening
      • Ornithological Screening
      • Wind farm 8
      • Capcity: 0.9MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Chiropterological Screening
      • Ornithological Screening
      • Wind farm 23
      • Capcity: 3MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Report EIA
      • Wind farm 38
      • Capcity: 14MW
      • Number of turbines: 7
      • Our area of responsibility:
      • Chiropterological Screening
      • Ornithological Screening
      • Chiropterological Survey
      • Ornithological Survey
      • Report EIA
      • Wind farm 15
      • Capcity: 2MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Project Specification Sheet
      • Wind farm 16
      • Capcity: 3MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Project Specification Sheet
      • Report EIA
      • Base transceiver stations 5
      • Operator: PTC ERA Sp. z o.o.
      • Other operators: none
      • Our area of responsibility:
      • Qualifications of Base Transceiver Stations
      • Report EIA
      • Base transceiver stations 2
      • Operator: PTC ERA Sp. z o.o.
      • Other operators: none
      • Our area of responsibility:
      • Qualifications of Base Transceiver Stations
      • Report EIA
      • Base transceiver stations 3
      • Operator: PTC ERA Sp. z o.o.
      • Other operators: none
      • Our area of responsibility:
      • Qualifications of Base Transceiver Stations
      • Report EIA
      • Base transceiver stations 11
      • Operator: PTC ERA Sp. z o.o.
      • Other operators: P4 Sp. z o.o.
      • Our area of responsibility:
      • Qualifications of Base Transceiver Stations
      • Report EIA
      • Base transceiver stations 4
      • Operator: PTC ERA Sp. z o.o.
      • Other operators: P4 Sp. z o.o.
      • Our area of responsibility:
      • Qualifications of Base Transceiver Stations
      • Report EIA
      • Wind farm 44
      • Capcity: 45MW
      • Number of turbines: 18
      • Our area of responsibility:
      • Project Specification Sheet
      • Chiropterological Screening
      • Ornithological Screening
      • Chiropterological Survey
      • Ornithological Survey
      • Report EIA
      • Wind farm 24
      • Capcity: 3MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Report EIA
      • Base transceiver stations 6
      • Operator: PTC ERA Sp. z o.o.
      • Other operators: PTK Centertel Sp. z o.o.
      • Our area of responsibility:
      • Qualifications of Base Transceiver Stations
      • Report EIA
      • Base transceiver stations 18
      • Operator: IT POLPAGER S.A.
      • Other operators: P4 Sp. z o.o., POLKOMTEL S.A.
      • Our area of responsibility:
      • Qualifications of Base Transceiver Stations
      • Environmental Assessments
      • Base transceiver stations 8
      • Operator: PTC ERA Sp. z o.o.
      • Other operators: none
      • Our area of responsibility:
      • Qualifications of Base Transceiver Stations
      • Report EIA
      • Wind farm 1
      • Capcity: 1MW
      • Number of turbines: 2
      • Our area of responsibility:
      • Report EIA
      • Wind farm 14
      • Capcity: 0.5MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Noise Assessment
      • Wind farm 73
      • Capcity: 30 MW
      • Number of turbines: 15
      • Our area of responsibility:
      • Noise Measurements
      • Post-performance Ornithological Monitoring
      • Mortality Monitoring of bats and birds
      • Wind farm 26
      • Capcity: 2.5MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Chiropterological Screening
      • Wind farm 21
      • Capcity: 4MW
      • Number of turbines: 2
      • Our area of responsibility:
      • Report EIA
      • Wind farm 3
      • Capcity: 0.9MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Ornithological Screening
      • Wind farm 12
      • Capcity: 54MW
      • Number of turbines: 18
      • Our area of responsibility:
      • Chiropterological Screening
      • Chiropterological Survey
      • Wind farm 10
      • Capcity: 0.5MW
      • Number of turbines: 1
      • Our area of responsibility:
      • Chiropterological Screening
      • Ornithological Screening
      • Project Specification Sheet
      • Ornithological Survey
      • Chiropterological Survey
      • Base transceiver stations 13
      • Operator: AERO2 Sp. z o.o.
      • Other operators: none
      • Our area of responsibility:
      • Qualifications of Base Transceiver Stations
      • Environmental Assessments
      • Base transceiver stations 12
      • Operator: PTC ERA Sp. z o.o.
      • Other operators: P4 Sp. z o.o., POLKOMTEL S.A.
      • Our area of responsibility:
      • Qualifications of Base Transceiver Stations
      • Report EIA
      • Base transceiver stations 15
      • Operator: IT POLPAGER S.A.
      • Other operators: PTC Sp. z o.o.
      • Our area of responsibility:
      • Qualifications of Base Transceiver Stations
      • Environmental Assessments
      • Base transceiver stations 17
      • Operator: IT POLPAGER S.A.
      • Other operators: Nordisk Sp. z o.o., P4 Sp. z o.o., POLKOMTEL S.A.
      • Our area of responsibility:
      • Qualifications of Base Transceiver Stations
      • Environmental Assessments
      • Base transceiver stations 16
      • Operator: IT POLPAGER S.A.
      • Other operators: PTC Sp. z o.o., P4 Sp. z o.o., PTK Centertel Sp. z o.o., POLKOMTEL S.A.
      • Our area of responsibility:
      • Qualifications of Base Transceiver Stations
      • Environmental Assessments
      • Wind farm 6
      • Capcity: 1.6MW
      • Number of turbines: 2
      • Our area of responsibility:
      • Chiropterological Screening
      • Base transceiver stations 14
      • Operator: AERO2 Sp. z o.o.
      • Other operators: none
      • Our area of responsibility:
      • Qualifications of Base Transceiver Stations
      • Environmental Assessments
    • Hover your mouse over selected dot to see details